Fuel Terminal Remediation System

Fuel Terminal Remediation System

Active Fuel Terminal, AS/MPE/SVE System Construction – Michigan Job Site Services, Inc. (JSS) was contracted to construct an air sparge (AS), multiphase extraction (MPE) and soil vapor extraction (SVE) system at an active fueling terminal. JSS provided general contracting and construction for the system which was designed and installed to prevent free product and contaminated…