Wetland Construction – Wurtsmith Air Force Base

WETLAND CONSTRUCTION – WURTSMITH AIR FORCE BASE Job Site Services, Inc. (JSS) was contracted to construct a 1000 GPM engineered treatment wetland. JSS provided general contracting and construction at this 8-acre site, active airfield with no disruption of airfield operations and per Michigan Department of Environmental Quality (MDEQ) permit schedule requirements. The system which was…

Air Force Wetlands Construction

Air Force Wetlands Construction

Wetland Construction – Wurtsmith Air Force Base Job Site Services, Inc. (JSS) was contracted to construct a 1000 GPM engineered treatment wetland. JSS provided general contracting and construction at this 8-acre site, active airfield with no disruption of airfield operations and per Michigan Department of Environmental Quality (MDEQ) permit schedule requirements. The system which was…